How Long Does a Kitchen Renovation Take? Timeline and Planning Tips

Written By :

Category :

Tips

Posted On :

Share This :


Renovating your kitchen is one of the most exciting—and involved—home improvement projects you can undertake. Whether you’re dreaming of a sleek modern layout or a cozy farmhouse design, understanding the timeline is key to keeping your project on track and stress-free. At Echelon Builds, we’ve broken down the typical kitchen renovation timeline and included planning tips to help homeowners in Calgary prepare confidently.

Average Kitchen Renovation Timeline

A standard kitchen renovation can take 6 to 12 weeks once construction begins, but the full process—including planning and design—often spans 3 to 6 months. Here’s a general breakdown:

Planning and Design (2–6 weeks)

This is the most critical stage. It involves:

  • Consulting with a contractor or designer
  • Creating floor plans
  • Choosing materials, finishes, appliances, and cabinetry
  • Securing permits (if required)

Tip: Finalize design details and materials before construction begins to avoid delays later.

Ordering Materials (2–8 weeks)

Lead times vary depending on the materials chosen:

  • Custom cabinets: 6–10 weeks
  • Countertops (e.g., quartz or granite): 1–3 weeks after cabinet installation
  • Appliances: 2–6 weeks

Tip: Order all major components early to keep construction moving on schedule.

Demolition (2–5 days)

Once everything is ready, the existing kitchen is carefully removed. This includes:

  • Cabinets and countertops
  • Flooring
  • Appliances
  • Possibly walls, depending on the layout changes

Tip: Prepare a temporary kitchen setup in another room to stay functional during this phase.

Structural Work and Rough-Ins (1–2 weeks)

This stage involves any:

  • Wall framing or adjustments
  • Plumbing, HVAC, and electrical updates

Tip: Ensure that any inspections required by local authorities are scheduled in advance to avoid downtime.

Installation (3–5 weeks)

This includes:

  • Cabinetry installation (1–2 weeks)
  • Countertop templating and installation (1–2 weeks after cabinets)
  • Backsplash, flooring, lighting fixtures, and appliances

Tip: Expect some overlap in tasks, but build in buffer time for unexpected delays.

Final Touches and Cleanup (1 week)

Final inspections, paint touch-ups, hardware installation, and deep cleaning wrap up the project.

Total Timeline Summary

PhaseEstimated Duration
Planning & Design2-6 weeks
Ordering Materials2-8 weeks (overlapping)
Demolition2-5 days
Structural/Rough-Ins1-2 weeks
Installation & Finishing2-5 weeks
Total6-12 weeks (build)

Top Planning Tips for a Smooth Renovation

  • Set a Realistic Budget: Include a 10–20% contingency fund for unexpected costs.
  • Communicate Clearly: Stay in regular contact with your contractor for updates and decisions.
  • Plan for Life Without a Kitchen: Set up a mini kitchen with a microwave, kettle, and fridge.
  • Be Flexible: Weather, inspections, or product delays can push schedules—build in buffer time.

Final Thoughts

While every kitchen renovation is unique, a well-planned project with a reliable team like Echelon Builds can keep stress to a minimum and results at their best. With the right prep, your dream kitchen will be well worth the wait. Contact us and let us help you with your kitchen renovation.